A job should move through the plant without three people chasing it.
Order to production to shipment. We map how a job actually moves through your operation — not the router, the real thing — then automate the purchasing, status, quality exceptions and paperwork that trail behind it.
The floor runs fine. The office around it is doing the running.
Every job status question means walking out to the floor or calling a supervisor who is mid-changeover.
Plant managerPurchasing works off a shortage report somebody rebuilds in a spreadsheet every morning.
Operations directorA non-conformance gets written up on paper and then somebody has to remember to do something about it.
Quality managerThe bottleneck in most plants we walk into is not a machine. It is the office coordination wrapped around the machines.
Where the coordination costs you, in a plant specifically.
These are the eight we look at first in a manufacturing operation. Which of them are worth building in yours is what the automation map answers, with the hours and the cost attached to each.
Order to job release
An order lands and becomes a job with the right routing, materials and dates against it, without somebody re-typing the customer’s PO into the ERP.
Shortage and reorder
Demand against on-hand and on-order, checked continuously rather than rebuilt each morning, with the purchase requisition drafted and waiting for approval.
Job status without asking
Where every job is, updated from the floor as it moves, so scheduling, sales and the customer all read the same thing without anyone being interrupted.
Quality exceptions
A non-conformance raises itself the moment it is logged, routes to the person who can disposition it, and holds the affected material until they do.
Supplier chasing
Confirmations, promised dates and late POs tracked and chased automatically, so purchasing spends its day on the exceptions rather than the list.
Certificates and paperwork
Cert of conformance, material certs, packing lists and shipping documents generated from the job record and attached where they belong.
Shipment and invoice
The shipment event raises the invoice the same day, against the right PO and terms, instead of at week’s end when somebody reconciles.
Machine and maintenance
Run hours and downtime captured against the asset, with preventive work scheduled off the counter rather than off a calendar reminder.
Same team. Same day. A different operation.
We build on what you already run.
Your ERP or MRP stays where it is and your team keeps working the way they know. The automation sits between the systems, doing what people were doing by hand. Where a supplier or customer portal has no way in, we automate the browser instead.
What plant owners ask.
Do you touch the machines or the controls?
Our ERP is old and does not have an API. Now what?
We run a lot of custom and one-off work. Does this still apply?
Will the floor have to learn a new system?
- 01How the work actually moves through your business today
- 02What you have already tried, and where it came apart
- 03Whether there is enough here to be worth building
You will be talking to the people who would actually build it. If there is something worth doing, we will tell you what it would look like. If there is not, then we build a relationship.